New Lamata Logo (1)

The Lagos Metropolitan Area Transport Authority (LAMATA) acknowledges recent reports and social media footage highlighting passenger discomfort on the Oyingbo–Agbado train service due to technical issues affecting the air conditioning system.

We sincerely apologize to our valued commuters for the heat and inconvenience experienced during their journey.

As part of our long-term strategy to enhance capacity, comfort, and service reliability, LAMATA is pleased to announce the expected delivery and operationalization of additional rolling stock by third quarter of 2026. The new acquisition will comprise three train sets, each with eight coaches — bringing a total of 24 additional coaches to strengthen the existing fleet and improve passenger experience across the Red Line corridor.

In the immediate term, our technical and engineering teams have been deployed to diagnose and resolve the root cause of the cooling system failure. Restoration works are ongoing, and efforts are being intensified to return the affected coaches to optimal operating condition as swiftly as possible.

LAMATA remains firmly committed to delivering safe, efficient, and world-class rail services. We continue to take proactive measures to minimize technical disruptions and improve overall service quality.

We appreciate the patience, understanding, and continued support of the public as we complete these essential repairs. The comfort, safety, and well-being of all passengers remain central to our operations.

Share
Previous Next
Close
Test Caption
Test Description goes like this
Need Help? Chat with us